How Much Does Concrete Restoration Cost for a Condominium in South Florida?

Building Restoration

Concrete restoration cost for a South Florida condominium

If your condominium is preparing for concrete restoration, one of the first questions the board will probably ask is:

How much is this going to cost?

Unfortunately, there is no reliable single price per square foot that applies to every building.

Two condominiums in South Florida can appear to need similar repairs and end up with very different project costs.

The reason is simple:

You are not only paying for concrete.

You are paying for the conditions required to repair it.

A repair inside an accessible parking garage is very different from a repair on the exterior of a high-rise condominium.
A repair inside an accessible parking garage is very different from a repair on the exterior of a high-rise condominium.

What determines the cost of concrete restoration?

The amount of damaged concrete is obviously important, but it is only one part of the estimate.

A concrete restoration contractor may also need to account for:

01

Repair quantities

How much concrete actually needs to be removed and replaced?

02

Location of the repairs

A repair inside an accessible parking garage is very different from a repair on the exterior of a high-rise condominium.

03

Access

Will the project require scaffolding, swing stages, boom lifts or other specialized access equipment?

04

Structural conditions

Does the project involve reinforcing steel, post-tensioning systems or other structural components requiring specialized procedures?

05

Waterproofing and coatings

Concrete repairs may be only one part of a larger restoration scope involving sealants, traffic coatings, waterproofing or exterior finishes.

06

Occupied-building logistics

Residents often keep living in the building. Parking, balconies, entrances, noise, dust and access may all need to be managed.

Each of these conditions can affect the final project cost.

Why the engineer’s estimated quantity matters

Before contractors bid on a concrete restoration project, an engineer may identify repair areas and estimate the quantities required.

For example: estimated concrete repair

5,000 sq. ft.

That quantity becomes an important part of the contractor’s estimate.

But concrete deterioration can extend beyond what is visible during the initial inspection.

Once demolition begins, the actual repair quantity may increase.

This is why condo boards should look beyond the total bid price and understand the unit prices, estimated quantities, allowances and assumptions behind it.

The lowest bid may not represent the lowest final cost

Imagine two contractors bidding on the same condominium restoration project.

Contractor A

Estimates fewer repairs and submits a lower total price.

Contractor B

Includes larger estimated quantities and submits a higher price.

At first glance, Contractor A appears less expensive.

But if demolition reveals additional deterioration, the project may require more work through change orders, which are formal modifications to the original construction contract.

Every building has different structural conditions, access requirements, deterioration and project constraints.
Every building has different structural conditions, access requirements, deterioration and project constraints.

Not simply

“Which contractor gave us the lowest number?”

But

“What is included in that number?”

How should a condo board evaluate the budget?

Before approving a concrete restoration project, the board and property manager should understand:

Budget checklist for the board

✓What work is included?
✓Which quantities are estimated?
✓What are the unit prices if quantities increase?
✓What is excluded from the proposal?
✓What allowances are included?
✓Is there contingency for unforeseen conditions?
✓How will additional work be documented and approved?

These questions help turn a contractor’s price into something the board can actually evaluate.

A better question than “How much per square foot?”

For a condominium association planning concrete restoration in Miami-Dade or South Florida, the objective should not be to find a universal price.

Every building has different structural conditions, access requirements, deterioration and project constraints.

A better question is:

“Do we understand what is driving the cost of our project?”

When the scope, quantities, assumptions and risks are clearly defined, a condo board can make a much more informed decision about its building and its budget.

Up next

What should a condominium board look for when choosing a concrete restoration contractor?

Want to understand what’s driving your project’s cost?

Group Landev helps condominium boards and property managers throughout South Florida make sense of restoration scopes, quantities and budgets.

Talk to our team

This article was originally published on LinkedIn.

More trending Posts